全屏通栏广告背景
导航菜单
全屏通栏广告背景
自定内容
自定内容
Adhere to integrity, people-oriented, build a better enterprise
自定内容
and the world's major machine companies supporting, selling well in more than 80 countries and regions
自定内容

自定内容
Welcome to Ningbo Hongwei Machinery Manufacturing Co., LTD.
自定内容
0086-574-88928658

自定内容
13906608332


自定内容
Hotline:
自定内容
Contact number:
全站搜索
搜索
自定内容

自定内容
自定内容

Keep track of news events

自定内容

Be the encyclopedia around you

当前位置
顶部菜单
自定内容

 
自定内容
PRODUCTS CENTER
自定内容
Enquiry hotline
自定内容
News information
空白边框
 
自定内容
0086-574-88928658
自定内容

文章分类
文章正文
What should we pay attention to when processing precision hardware parts?
author:Administrator   Publish in:2023-08-10 11:46:37    Text:【big】【medium】【small】browse (493)
Abstract:1. Check whether the moving part is filled with lubricating oil before mechanical work, and then start and check whether the clutch and brake are normal, and run the machine empty for 1-3 minutes, and strictly prohibit operation when there is a mechanical failure.
1. Check whether the moving part is filled with lubricating oil before mechanical work, and then start and check whether the clutch and brake are normal, and run the machine empty for 1-3 minutes, and strictly prohibit operation when there is a mechanical failure.
2, work to maintain the correct posture, to have sufficient mental coping with the work, if found unwell immediately leave the work, and reflect to the leader. The operation must be concentrated, it is strictly forbidden to talk, cooperate with each other, the operator should not operate in a state of irritability and fatigue, so as to avoid accidents and ensure the safety of operation. All employees should check whether their clothing meets the job requirements before entering the job. Do not wear slippers, high heels and clothing that affect safety. Wear a helmet if you have long hair.
3. When replacing the mold, first turn off the power, and only after the press movement department stops running, can the installation and debugging of the mold begin. After installation and adjustment, move the flywheel by hand to test twice, check whether the upper and lower molds are symmetrical and reasonable, whether the screws are firm, and whether the holder ring is in a reasonable position.
4, must wait for other personnel to leave the mechanical work area, and take away the debris on the workbench, before starting the power to start the machine.
5, mechanical work, do not extend the hand into the slider working area, do not use the hand to take, release the work. Standard tools must be used when taking and releasing parts in the die. If the machine has abnormal sound or machine failure, the power switch should be turned off immediately for inspection. After the machine is started, one person shall carry the material and operate the machine. Other people shall not press the electric building or step on the foot switch plate, nor shall they put their hands into the mechanical working area or touch the moving part of the machine with their hands.
6, after work, should turn off the power, and sort out the finished products, side materials and debris on the post, to ensure that the working environment is clean and safe.

Zhejiang ICP No. 2022001831-1    Copyright © Ningbo Hongwei Machinery Manufacturing Co., LTD
导航菜单
自定内容
CONTACT US
自定内容
MOBILE TERMINAL
空白边框
 
空白边框
 
自定内容
NAVIGATION
空白边框
 
自定内容
  
导航菜单
自定内容
Bottom navigation
自定内容




自定内容
Service hotline:0086-574-88928658
自定内容
fax:0086-574-88928657
自定内容
E-Mail:mgp@mgp.com.cn

自定内容
Add: No. 92, Yinfeng Road, East Suburb Development Zone, Fenghua, Ningbo, Zhejiang
自定内容

自定内容
Mobile QR code